SP-027 - Specification for Rock Excavation

SP-027 - Specification for Rock Excavation

Part 645 Construction Inspection National Engineering …

rock materials requires a greater tolerance in design and construction than for most other construction ma-terials. Materials range from fine-grained soils (50% or more passing a No. 200 sieve) to rocky soils (predomi-nantly gravel and cobbles) or combinations of these. The availability of materials at the site, their engineer-

Get a Quote

SPECIFICATIONS - dot.state.pa.us

The work shall consist of the excavation required by the drawings and specifications and disposal of the excavated materials. 2. Classification. Excavation is classified as common excavation, rock excavation, or unclassified excavation in accordance with the …

Get a Quote

FOREWORD - Terengganu

quality of constructed product. In unison, these new specifications have a significant positive impact on the construction industry especially with the incorporation of new products and technologies. Standard Specification for Road Works is an essential component in the road infrastructure construction industry.

Get a Quote

STANDARD SPECIFICATIONS for CONSTRUCTION and …

Aug 21, 2004 · 2018 Standard Specifications for Construction and Materials . Inspector —The authorized representative of the procurement officer assigned to make detailed inspection of any or all portions of the work, or materials therefore. Procurement Officer —Any person authorized by a State agency in accordance with law

Get a Quote

SECTION 125 - fdotewp1.dot.state.fl.us

1254.3 Rock Excavation: Clean all rock and other hard foundation material, remove all loose material, and cut all rock to a firm surface. Either level, step vertically and horizontally, or serrate the rock, as may be directed by the Engineer. Clean …

Get a Quote

EPA REGION 2

RC ROCK CORE SB BENTONITE FIELD SC CEMENT FIELD SD DRILL CUTTINGS, SOLID MATRIX FIELD SE SP PIPING, ETC.) CASING (PVC, STAINLESS STEEL, CAST IRON, IRON FIELD 027 UNKNOWN 028 GPS unspecified 029 GPS, with Canadian active control system

Get a Quote

SERIES 600 EARTHWORKS - Standards for Highways

VOLE 1 SPECIFICATION FOR HIGHWAY WORKS Amendment – February 2016 1 SERIES 600 EARTHWORKS Contents ClauseTitle Page #601 (02/16) Classification, Definitions and Uses of Earthworks Materials Buried Structures3 602 (02/16) General Requirements 6246 603 (02/16) Forming of Cuttings and Cutting Slopes 8 604 (02/16) Excavation for Foundations 9

Get a Quote

SUPERPAVE ASPHALT CONCRETE - fdotewp1.dot.state.fl.us

Superpave mixes are identified as Type SP-9.5, Type SP-12.5 or Type SP-19.0. All test methods designated as FM refer to the FDOT Florida Sampling and Testing Methods. All references to the Department shall mean the local agency. All references to the Engineer shall mean the designated Engineer of the local agency.

Get a Quote

2018 Specifications and Special Provisions - NCDOT

Guidance in the methods, procedures, policies, and criteria for Drainage Studies and Hydraulic Design. Intelligent Transportation Systems. Checklists, forms, designs and information on using NCDOT's workspaces. Notes and Provisions. Geotechnical standard notes and provisions for the 2012 and 2018 Standard Specifications.

Get a Quote

PART VII INCIDENTAL CONSTRUCTION - Louisiana

701.03 EXCAVATION. For all trench excavation, ensure that the sides of the trench are stable, as evidenced by the sides of the trench being able to maintain a vertical cut face. Consider the sides unstable if fissures develop in the face of or adjacent to …

Get a Quote

Sandvik Group — Home

Nov 18, 2021 · Sandvik is an engineering group in mining and rock excavation, rock processing, metal cutting and materials technology, providing optimized products and solutions based on digitalization, innovation and sustainable engineering.

Get a Quote

Washington State Department of Transportation

Washington State Department of Transportation

Get a Quote

SP-027 - Specification for Rock Excavation

Specification For Rock Excavation 25 November 2008 SREii The Contractor shall be solely responsible for obtaining the necessary licences for the procurement, possession, transport, storage and handling of explosives and for ensuring the validity of such licences at all times. Before starting work, the Contractor shall satisfy the

Get a Quote

CONSTRUCTION SPECIFICATION FOR RIP-RAP, ROCK …

construction specification for rip-rap, rock protection, and granular sheeting table of contents 511.01 scope 511.02 references 511.03 definitions - not used 511.04 design and submission requirements - not used 511.05 materials 511.06 equipment - not used 511.07 construction 511.08 quality assurance - not used

Get a Quote

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

(a) The excavation is cut in solid rock or other equally stable material, excluding frozen ground; (b) The excavation is cut in cohesive, granular or other material to a stable slope based on the material properties of the in-situ material and as determined by a geotechnical engineer.

Get a Quote

MDOT - Plans & Specifications

2020 Standard Specifications for Construction with Errata 2020 Standard Specifications for Construction Significant Changes from 2012 Standard Specifications for Construction. This document is for information only.

Get a Quote

JANUARY 2019 Standard Specifications - FDOT

JANUARY 2019 STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. January 2019 Standard Specifications eBook . NEW! January 2019 Redline eBook . …

Get a Quote

Roadway Design and Construction Standards Appendix A

Oct 01, 2021 · Roadway Design and Construction Standards Appendix A Douglas County Roadway Design and Technical Criteria Manual Appendix A Page 1 of 4 CUL-DE-SAC & URBAN LOCAL TYPE I SP.1 URBAN LOCAL TYPE II SP.2 ENTRY STREET, SCHOOL ACCESS STREET & COMMERCIAL AND INDUSTRIAL SP.3 ENTRY STREET WITH MEDIAN SP.3a URBAN …

Get a Quote

Construction equipment | GiANT wheel loaders for sale

GiANT G5000 X-TRA / inkl. Schaufel und Gabeln General grade (1 min - 5 max): 4, Gross Weight: 5100, Engine: Diesel - Kubota V3307-CR-T-EW03 / 74 PS, Front tyres remaining: 80 - %, Rear tyres remaining : 80 - % Wheel loaders 2020 5 h Germany

Get a Quote

SECTION 201 ROADWAY AND DRAINAGE EXCAVATION

CONSTRUCTION 201.31 Rock Cuts – See SS 204. 201.32 Overhanging Rock and Boulders – The Contractor shall remove overhanging rock or boulders within the excavation limits, as ordered by the Ministry Representative, and shall backfill and compact all resulting cavities to allow the safe passage of construction and

Get a Quote